FAQ

What is the delivery time?
The delivery time is typically 15 to 30 days after receiving the payment.
What is the minimum order quantity (MOQ) for this product?
The usual MOQ is one 20-foot container, which can include a mix of two different designs.
How can I get a sample?
Samples are provided for free, but you will need to cover the shipping cost.
What are the payment terms?
We accept T/T payments, with a 30% deposit in advance and the remaining 70% balance to be settled before shipment.
Can I inspect the goods at the Jinsun factory before loading?
Yes, all customers are warmly welcome to inspect the goods before loading.